Step 1: Engineering King Enterprises has aligned themselves with many reputable engineering companies throughout Wyoming.
Step 3: Foundation Crawlspaces, basements, daylighted basements, or walk-out basements are types of foundations that can be provided.
Step 4: Installation of Homes Home is craned upon the foundation. Then the proper measures are used per the manufacturer's instruction to complete the installation of the home.
Step 7: Plumbing King Enterprises contracts with experienced & reputable plumbing companies to ensure accurate and dependable service.
Step 9: Interior Carpentry
Drywall techniques are completed
All remaining trim work is completed
Installation of custom showers, tubs, and sinks are installed per project specifications
Step 11: HVAC Most modular homes come with forced air heating systems. However, if the project specifications require a different type of system, this work can be completed. Air conditioning systems can also be installed.